The new train parking facility in Sundland in Drammen has been equipped with a Roediger supply and disposal system, which was completed in record time.
In addition to the modernisation of the workshop, BaneNOR has also commissioned the supply and disposal on two external tracks. The work was carried out by Dahlrail in co-operation with Roediger Vacuum.
Roediger supplied 12 supply and disposal cabinets, 6 drinking water supply cabinets and a compact vacuum station. Due to the harsh weather conditions, the system is designed for operation down to -30°C.
This article was originally published by Roediger Vacuum.
Use the form opposite to get in touch with Roediger Vacuum directly to discuss any requirements you might have.