Crossrail: New Footage Reveals Tunnel Fit-Out Progress

New images released by Crossrail reveal further tunnel fit-out progress as work continues under London to install the overhead catenary system.

A dedicated team of engineers is working around the clock to install the 2 x 25kV overhead traction power system.

Where does the power come from?

Each Elizabeth line train will draw power in the tunnels from the rigid overhead catenary system’s aluminium alloy conductor bar which houses copper contact wire. These bars are currently being installed in 10 metre sections.

The main power supply in the tunnels under central London will come from two new bulk supply points and their associated autotransformer feeder stations which are being built at each end of the new railway along with autotransformer sites in east and southeast London.

Over 1,500km of cable is being used to supply power, lighting and ventilation systems to the new railway.

Original article © Crossrail.

FOR ALL THE LATEST INFORMATION, NEWS, IMAGES, VIDEOS AND ARTICLES ON ALL ASPECTS OF INFRASTRUCTURE, PLEASE CLICK HERE.

Get your news featured on Railway-News

Please fill in the contact form opposite. A member of the team will be in touch shortly.







    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter