Signal Case Protection Systems for Railway Infrastructures
The system permits replacement of a deteriorated signal case in as little as four hours without the need to disconnect electrical relays or circuits. By using this process, trains travel freely on the affected tracks while the work is underway and the elements of risk and expensive track slowdowns are completely eliminated.