Rail News

Alstom Completes First All-Electric Locomotive at Indian Facility

Alstom announced the completion of its first all-electric locomotive from its state-of-the-art locomotive facility at Madhepura in the State of Bihar, on schedule.

In line with the Government’s and Indian Railways’ target towards 100% electrification and towards sustainable mobility, these new locomotives will not only bring down operating costs for the Railways but will significantly cut down greenhouse gas emissions as well.

All-Electric Locomotive
Alstom completes most powerful all-electric “Make-In-India” locomotive from Madhepura © Alstom

Developing India’s Infrastructure Needs

This first locomotive is part of a €3.5 billion order comprising 800 electric double-section locomotives signed in 2015 which contributes to the Ministry of Railways’ public-private partnership programme to modernise the country’s rail infrastructure. This agreement remains the largest Foreign Direct Investment in the railways sector to date and has a strategic role in creating a multiplier effect on the economy. This contract is also one of the biggest contracts in the history of Alstom.

Related Post:  UWC Subsidiary UNICON 1520 to Provide Tank Containers and Flat Cars to RusVinyl

Henri-Poupart Lafarge, Chairman and CEO, Alstom, said:

“Our operations in India are paramount to our business globally and we continue to stay committed to developing India’s infrastructure needs, improving the quality of services to citizens and investing in the nation’s economy”

“This project stands as a shining example of Alstom’s commitment to ‘Make in India’. Apart from creating thousands of jobs directly and indirectly, we have created a strong localised supply chain for this project, with 90% of the components sourced locally”

All-Electric Locomotive

Thanks to its 12,000 horsepower, each double section locomotive, part of Alstom’s Prima locomotives family, has a hauling capacity of 6,000 tonnes and speed of 120km/hr, allowing faster and safer movement of heavier freight trains across the country, thereby reducing congestion for passenger train services and freight. Equipped with IGBT based propulsion technology, these locomotives will be compliant with Indian standards of freight transport and will have the ability to endure tough Indian climate and conditions. The locomotives were developed with the support of 6 Alstom sites in France: Belfort for the 6 first car bodyshells, and Ornans for the motors, Tarbes for the traction, Le Creusot for bogies, Villeurbanne for the train control monitoring systems and Saint-Ouen for the design.

Related Post:  Deutsche Bahn Awards Flat Car Tender to United Wagon Company

Alstom’s Operations in India

In another significant development, Alstom announced three new contracts worth approximately €75 million – power supply contract from the Mumbai Metro Rail Corporation Ltd (MMRCL), contract for new train sets from Chennai Metro Rail Corporation and another power supply contract from Jaipur Metro Rail Corporation. This development shows Alstom’s growing footprint in the country, in both the urban space as well as the mainline space.

Additionally, phase 1 in the construction of the electric locomotive facility at Madhepura and the depot at Saharanpur is complete and work is progressing as per the contractual timelines. To give skilling and local hiring an impetus, focused efforts towards nurturing young minds in communities in and around Madhepura have been initiated. With the help of local NGOs, Alstom Foundation is working to foster better health care, education and dignified livelihood in the area.

Related Post:  Renfe Awards 3 Rolling Stock Maintenance Contracts to Alstom

Original press release © Alstom.

FOR ALL THE LATEST INFORMATION, NEWS, IMAGES, VIDEOS AND ARTICLES ON ALL ASPECTS OF ROLLING STOCK, PLEASE CLICK HERE

News categories

    21 Feb 2019
    Alstom Pledges Universal Accessibility in Transport
    18 Feb 2019
    10 Must-Read Rail News Stories – Industry Insider for Week 7
    14 Feb 2019
    MP14 Rolling Stock for Line 14 of the Paris Metro Begins Dynamic Testing
    11 Feb 2019
    12 Must-Read Rail News Stories – Industry Insider for Week 6
    07 Feb 2019
    European Commission Says No to Alstom-Siemens Mobility Merger
    04 Feb 2019
    11 Must-Read Rail News Stories – Industry Insider for Week 5
    31 Jan 2019
    Alstom and Ajman University (UAE) Sign Memorandum of Understanding
    28 Jan 2019
    Siemens-Alstom Merger Update Following Remedy Proposal to the European Commission
    Subscribe to Railway-News
    Get the latest contract alerts and Railway News emailed directly to your inbox.

    We respect your privacy and take protecting it seriously.

    Please tick to confirm you would like to receive emails we think may be of interest to you. We sometimes tailor the content you see to what we think you'll find interesting, and so monitor your interaction with our website and email content (find out more).