Rail News

Safety Upgrades on Victoria Level Crossings

Image courtesy of Alstom

The Burke Road Level Crossing removal project, which aims to remove 50 of the busiest and most dangerous level crossings in the Australian state of Victoria over the next eight years, is well underway with the assistance of Alstom’s SmartLock 400 interlocking signalling system. The Burke Road level crossing has caused significant disruption in Melbourne, with boom gates down for 40 minutes during the morning rush hour and posing a risk to commuters and pedestrians.

Alstom oversaw the removal of the level crossings and the installation of the SmartLock 400 system, the third such installation in Victoria. Alstom’s Melbourne-based team adapted the system to the specifications of Burke Road, while keeping it adaptable enough to allow for an expansion of the system at a later date from a centralised location.

News categories

    24 Jun 2019
    Alstom to Equip Harsco Rail Vehicles for SBB with ETCS
    24 Jun 2019
    Alstom to Supply 8 Coradia Lint Diesel Trains to ODEG
    24 Jun 2019
    Industry Insider Week 25 – 9 Must-Read Rail Stories
    19 Jun 2019
    Alstom P80 Point Machine Passes Testing in Kazakhstan
    17 Jun 2019
    Industry Insider Week 24 – 7 Must-Read Rail Stories
    12 Jun 2019
    Alstom to Supply 18 Coradia Lint DMUs to Baden-Württemberg
    10 Jun 2019
    Industry Insider Week 23 – 13 Must-Read Rail Stories
    05 Jun 2019
    UK: Alstom Reveals Its Design for HS2 Trains
    Subscribe
    Subscribe to Railway-News
    Get the latest contract alerts and Railway News emailed directly to your inbox.

    We respect your privacy and take protecting it seriously.

    Please tick to confirm you would like to receive emails we think may be of interest to you. We sometimes tailor the content you see to what we think you'll find interesting, and so monitor your interaction with our website and email content (find out more).