Wavetrain Systems AS Installation Film

Address: Postbox 23
1324 Lysaker
Norway
Phone: +47 22 77 99 40 Connect: Website: View website Contact: Contact supplier View: View supplier

Wavetrain Systems AS Installation Film

How to Install the Wavetrain Level Crossing Warning System.

A typical installation includes:

  • A footpath or bridleway
  • A pole on each side of the crossing
  • Mains power with circuit breakers

To install the system, you’ll need:

  • A control unit with pedestal
  • Two sensors per rail including clamps
  • Warning measures such as lights and sounders

Now, you are ready to install the Level Crossing Warning System!

wavetrain.no

Latest Wavetrain Systems AS News

Wavetrain Systems at Rail Live 2023

Wavetrain Systems at Rail Live 2023

Wavetrain Sytems AS will be present at Rail Live 21–22 June 2023 at the ‎Long Marston Rail Innovation Centre in Warwickshire.

Wavetrain Systems AS at InnoTrans 2022

Wavetrain Systems AS at InnoTrans 2022

Wavetrain Systems AS will be attending InnoTrans in Berlin, 20-23 September 2022. Come and visit us at hall 22, stand 120!

Contact Wavetrain Systems AS

Use the form opposite to get in touch with Wavetrain Systems AS directly to discuss any requirements you might have.









    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter