On 6 June, Greater Anglia opened the gates of its Crown Point Depot in Norwich to the public for the first time, providing a rare opportunity to see how a modern railway maintenance facility operates.

Held as part of the Railway 200 celebrations, the open day attracted more than 1,200 visitors and offered a behind-the-scenes look at the depot responsible for maintaining Greater Anglia’s Class 745 intercity and Class 755 regional fleets.

Trains at Greater Anglia's Crown Point Depot
Trains at Greater Anglia’s Crown Point Depot

Located close to Norwich station, Crown Point has been crucial to railway operations in East Anglia since opening in 1982. Today, the facility is operated in partnership with Stadler and plays a key role in supporting services across the region. According to Greater Anglia, up to 27 trains are refuelled and sanded at the depot every 24 hours.

Inspection pits for Greater Anglia trains
Inspection pits for Greater Anglia trains

The open day event highlighted the engineering infrastructure required to support a modern passenger fleet. Across the site, visitors were able to examine major components such as wheelsets, traction motors, engines and bogie components.

The exhibits illustrated the scale and complexity of rolling stock maintenance. Wheelsets, for example, remain one of the most critical safety-related components on any train, requiring regular inspection to monitor wear, profile condition and overall performance.

Maintenance on a Greater Anglia train
Maintenance on a Greater Anglia train

The depot itself provided a glimpse into the infrastructure required to maintain today’s trains. Inspection pits, lifting equipment and maintenance roads allowed visitors to see where routine servicing, examinations and repairs are undertaken.

Lifting equipment
Lifting equipment

One of the recurring themes throughout the event was the relationship between technology and workforce expertise. Although modern fleets incorporate advanced diagnostics and condition-monitoring systems, maintenance remains heavily dependent on skilled engineers, technicians and depot staff. The opportunity to meet those responsible for maintaining the fleet provided valuable insight into the range of technical and operational roles required to keep services running.

For the rail industry, events such as the Crown Point open day serve a purpose beyond public engagement. They provide an opportunity to showcase engineering careers, improve understanding of railway operations and demonstrate the investment required to maintain modern fleets.

Wheelset components at Crown Point Depot
Wheelset components at Crown Point Depot

Tags

Products & Services

Get in touch

Please fill in the contact form opposite. A member of the team will be in touch shortly.








    Advertise with UsGeneral EnquiryEditorial Request

    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.