Stertil-Koni: RF WAGONLIFT Mobile Column Lift

Change the wheels of a wagon in 20 minutes with 6 easy steps with the RF WAGONLIFT (Rail Freight) from Stertil-Koni.

Step One: Undo the keep bolts holding the wheels in the bogies

Step Two: Position column lifts under wagon and through bogie frame openings

Step Three: Lift wagon bogies, wheel remain behind track

Step Four: Roll wheels out and bring replacement wheels

Step Five: Lower wagons onto new wheels

Step Six: Remove column lifts and adjust keep bolts

The WAGONLIFT allows wagons and bogies to be lifted simultaneously, leaving the wheels on the track. The lift provides a solution for:

  • All types of Wagons: open, covered, flat, tank
  • All variety of gauges: standard, wide, narrow
  • Inspections (e.g. axle corrosion and mechanical damage)
  • Maintenance (wheel set changes and general repair)
  • Manufacturing

Versatility with Unique Bogie Supporting Anvil 

Contact [email protected] for more details and information.

stertilkoni.com/en/

Visit Supplier

Visit Supplier Website

Contact Stertil-Koni

Address:

Westkern 3
9288 CA Kootstertille
The Netherlands

Contact:

Call: +31 (512) 334444

More News

Get in touch









    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.