YAPIRAY – Irmak, Karabük and Zonguldak Project

YAPIRAY – Irmak, Karabük and Zonguldak Project
Contact: Contact supplier View: View supplier Download: Download

YAPIRAY

Irmak, Karabük and Zonguldak Project

lrmak – Karabük Zonguldak Line with its characteristic as a corridor from Black Sea to Anatolia will have important function in passenger and freight transport. The project’s main part, Zonguldak – Karabük line is about to be completed. The line is renewed from start to finish in accordance with EU standards. Used rails and switches are domestic goods. Line renovation works continue apace. The project will be completed in January 2016.

Irmak – KarabüK – Zonguldak – Railway Rehabilitation and Signalisation Project

Job start – end dates: 01.01.2013 / 24.02.2016

Line Length: Main line 415 km single track. 62.3 km station paths

Rail type: 49 E1

Switch type and quantity: 1:9 R=300  200 Units

Sleeper type: B58, W14

Download the full PDF here.

yapiray.com

Other YAPIRAY Documents

Latest YAPIRAY News

Zambia Railway Rehabilitation Project

Zambia Railway Rehabilitation Project

27 pieces of bridge and 11 pieces of damaged culverts were examined by YAPIRAY during the structural evaluation of a railway in Zambia.

Track Inspection Works

Track Inspection Works

YAPIRAY carried out track inspection works with solution partners "ZETICA" and "GEAR RAIL" along a 1.021km long railway line.

Contact YAPIRAY

Use the form opposite to get in touch with YAPIRAY directly to discuss any requirements you might have.








    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter