Wabtec GoLINC-M Case Study

Wabtec GoLINC-M Case Study
Contact: Contact supplier View: View supplier Download: Download

Wabtec UK

Project

GoLINC-M Modules

Client

Eversholt Rail Group

A vital part of Remote Condition Monitoring (RCM) is retrieving data from the systems on the trains. In many legacy fleets, the existing on- board Ethernet infrastructure is not in place to do this, or the equipment itself is often not set up for connection to Ethernet networks. Even in many newer fleets, the detailed system information is not exposed to the existing network. The M Module project addresses these issues by directly connecting to maintenance ports on equipment and communicating data wirelessly without the need for existing infrastructure.

Deliverables

  • Provide a method of quick and easy retrofit of RCM to legacy trains.
  • Be able to connect to equipment which may not have Ethernet networking capabilities.

Challenges

  • Retrofit of RCM systems to trains is difficult for a number of reasons:
  • Running long new cables to equipment is often disruptive and costly.
  • Lack of space for new conduits and equipment.
  • Lengthy downtime for installation of lots of new cables often unacceptable and costly.
  • Avoid the need for lengthy cable and conduit runs.
  • Have a solution which can be utilised on trains without an existing Ethernet network, without the need to install one.
  • Legacy equipment often does not have Ethernet networking capabilities.
  • Even if equipment does have Ethernet networking capabilities, there are often insufficient spare ports on existing Ethernet networks on the train to connect all of the pieces of legacy equipment which may want to be monitored.

> Download the full Case Study

www.wabtec.com

Other Wabtec UK Documents

Latest Wabtec UK News

Wabtec Celebrates the 1,000th Modernized Locomotive in the Americas

Wabtec Celebrates the 1,000th Modernized Locomotive in the Americ...

Wabtec Corporation has celebrated its 1,000th locomotive modernization in the Americas, having reduced more than 1.4 million tons of CO2.

Contact Wabtec UK

Use the form opposite to get in touch with Wabtec UK directly to discuss any requirements you might have.








    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter