Using TECHNO-CRETE® in Rail Construction Projects

Using TECHNO-CRETE® in Rail Construction Projects
Address: 503 Broadway
Letchworth
Hertfordshire
SG6 3PT
UK
Phone: +44 (0)1462 379000 Connect: Website: View website Contact: Contact supplier View: View supplier Download: Download

Complete Composite Systems (CCS)

Using TECHNO-CRETE® in Rail Construction Projects

This article first appeared in the Railway-News magazine Issue 1 2022.

More rail construction projects are turning to the innovative, eco-friendly post mix TECHNO-CRETE® for their foundation material. Here’s why…

TECHNO-CRETE® is a hydrophobic polyurethane foam foundation system. Made from a blend of reprocessed oil from the catering industry and sustainably grown rapeseed oil, it is rapidly becoming the prime post mix choice, offering a green and cost-effective alternative to concrete. Its ease of use and minimal bulk-dispensing qualities also ensure faster installation and reduce health and safety concerns.

How It Works

Available in two packs, part A of TECHNO-CRETE® consists of a blend of recycled organic mineral oils from the catering trade and rapeseed oil, while part B contains isocyanate.

When the two packs of liquid are mixed together and poured into the hole around the post, the liquid blend expands to 20 times its initial volume to create a lightweight, high-density foam. That foam mixture rises to fill the hole and encapsulates the post, becoming a solid mass able to hold the post within ten minutes. Curing time is 24 hours but the post is hard enough to fix to within one hour.

A huge advantage that TECHNO- CRETE® has over cement-based products is its ability to be used in inclement weather. If the ground or air temperature dips below 0 degrees centigrade, the water required to mix the concrete will freeze, whereas even if temperatures drop below zero, the exothermic reaction of TECHNO- CRETE® still takes place, resulting in no delays regardless of weather conditions.

Concrete Comparison

Concrete works by virtue of mass of material. In order to fill a typical 300mm diameter x 600mm deep fence post hole, 3 x 20kg bags of concrete post mix plus 20 litres of water would be required. TECHNO- CRETE®, however, uses skin friction to its advantage and that same post would need just one 1.8kg bag of TECHNO-CRETE® — and no water — to support it.

Download the full PDF here.

completecomposites.co.uk

Other Complete Composite Systems (CCS) Documents

Latest Complete Composite Systems (CCS) News

CCS Achieves ISO 9001 Certification

CCS Achieves ISO 9001 Certification

We are delighted to announce that Complete Composite Systems has been awarded ISO 9001 accreditation.

Composite Ballast Boards Solve Problem at Earley Station

Composite Ballast Boards Solve Problem at Earley Station

CCS' innovative composite ballast boards were put to good use to protect rail passengers from a power supply cabinet in Berkshire, England.

Saving Time and Money With TECHNO-CRETE®

Saving Time and Money With TECHNO-CRETE®

CCS's TECHNO-CRETE® was once again proven to be a more cost-effective solution than concrete post mix during a trackside project in Wales.

CCS Publishes EPDs of Its Products

CCS Publishes EPDs of Its Products

Complete Composite Systems is proud to announce that it has published EPDs for two of its products, with more on the way.

New Project Highlights ARCO’s Versatile Installation Options

New Project Highlights ARCO’s Versatile Installation Options

There's a wide range of installation options available for fitting the ARCOSYSTEM® cable containment system beside railway tracks.

ARCOSYSTEM®’s Major Role in Transpennine Route Upgrade

ARCOSYSTEM®’s Major Role in Transpennine Route Upgrade

CCS' ARCOSYSTEM® cable troughing is proving to be a reliable and cost-effective choice for the major Transpennine Route Upgrade (TRU).

Why Composite Bridges Are the Future

Why Composite Bridges Are the Future

In association with BGL Ingenieurbau GmbH, CCS manufactures composite bridges from sustainable glass-fibre reinforced polyester (GRP).

Introducing Composite Ballast Boards

Introducing Composite Ballast Boards

The new CCS Composite Ballast Boards protect railway lines and trackside facilities from hazards such as rockfalls or snowslides.

ARCO’s Proficiency on Full Show

ARCO’s Proficiency on Full Show

Complete Composite Systems' ARCOSYSTEM® cable troughing was on full display during two recent trackside installations in Germany.

Check Out Our Eco-Friendly Products at Rail Live!

Check Out Our Eco-Friendly Products at Rail Live!

Rail Live offers the perfect opportunity to see CCS' innovative range of sustainable products for rail construction projects.

Why TECHNO-CRETE® Is the Practical Choice of Foundation Material

Why TECHNO-CRETE® Is the Practical Choice of Foundation Material

TECHNO-CRETE® is proving to be a successful and increasingly popular alternative to concrete post mix for rail construction projects.

ARCOSYSTEM® Is the Solution for EVCP Installation

ARCOSYSTEM® Is the Solution for EVCP Installation

CCS' cable containment system, ARCOSYSTEM®, proved to be an ideal choice for the challenging installation of EV charging points in Letchworth.

Fixing the Sleek Version of Arco with Ease

Fixing the Sleek Version of Arco with Ease

SizeZero®, the narrowest size of ARCOSYSTEM® troughing available, was fitted along a 4km stretch of track between Lubeck and Ahrensburg.

Collaboration with Anchor Systems Announced

Collaboration with Anchor Systems Announced

CCS has announced a collaboration with Anchor Systems International Ltd, making installation of the ARCOSYSTEM® cable troughing even faster.

How ARCO Can Be Attached to Rock Walls

How ARCO Can Be Attached to Rock Walls

CCS's innovative cable troughing ARCOSYSTEM® was recently fixed to a trackside rock wall during a challenging installation.

Installing ARCOSYSTEM® on Noise Barriers

Installing ARCOSYSTEM® on Noise Barriers

Recent installations show how CCS's elevated cable troughing, ARCOSYSTEM® can be securely attached to trackside noise barriers.

ARCOSYSTEM® the Perfect Fit In Scenic Austria

ARCOSYSTEM® the Perfect Fit In Scenic Austria

ARCOSYSTEM® elevated cable troughing was expertly installed at some challenging trackside locations in Austria.

No Earth Bonding Ensures TouchSAFE Fencing Saves Time and Money

No Earth Bonding Ensures TouchSAFE Fencing Saves Time and Money

Find out why TouchSAFE composite palisade fencing from Complete Composite Systems can save manufacturers time and money.

Discover More about ARCOSYSTEM® at InnoTrans!

Discover More about ARCOSYSTEM® at InnoTrans!

Complete Composite Systems will be on hand at InnoTrans 2022 to exhibit their cable troughing system, ARCOSYSTEM®.

A Picturesque Triumph for ARCO SizeZERO®

A Picturesque Triumph for ARCO SizeZERO®

ARCO SizeZERO®, the specialist narrower version of ARCOSYSTEM® was the ideal solution for the ski resort of Willingen-Upland, Germany.

See CCS’ Ground-Breaking Products at Rail Live 2022

See CCS’ Ground-Breaking Products at Rail Live 2022

A range of Complete Composite Systems' innovative composite and engineered plastic products will be showcased at the Rail Live 2022.

Navigating Bridges Is No Problem for ARCOSYSTEM®

Navigating Bridges Is No Problem for ARCOSYSTEM®

CCS's cable management product ARCOSYSTEM®, proved it can be successfully attached to a range of bridges in a group of recent installations.

Testing Project Displays ARCOSYSTEM®’s Adaptability

Testing Project Displays ARCOSYSTEM®’s Adaptability

ARCOSYSTEM® is designed to be adaptable so it can be installed in a variety of challenging settings, as proven in this recent installation.

TECHNO-CRETE® Plays Pivotal Role on TFL Project

TECHNO-CRETE® Plays Pivotal Role on TFL Project

TECHNO-CRETE® has made a significant contribution to a low-carbon, sustainable energy project on the London Docklands Light Railway network.

Flexibility of ARCOSYSTEM® on Full Show

Flexibility of ARCOSYSTEM® on Full Show

The flexibility of CCS's elevated cable management product ARCOSYSTEM® was clear during a recent installation in Germany.

TECHNO-CRETE®’s Huge Advantage over Concrete

TECHNO-CRETE®’s Huge Advantage over Concrete

Complete Composite Systems' eco-friendly post-mix TECHNO-CRETE® can be used on site during freezing temperatures.

Complete Composite Systems: Successful Installation in Flood-Hit Area

Complete Composite Systems: Successful Installation in Flood-Hit ...

Complete Composite System's versatile cable management product ARCOSYSTEM®, was successfully fitted in Kordel, Germany.

Complete Composite Systems: ARCOSYSTEM® Works Downhill

Complete Composite Systems: ARCOSYSTEM® Works Downhill

ARCOSYSTEM®️ from Complete Composite Systems was used in the challenging hillside project in the town of Neuhausen am Rheinfall.

TECHNO-CRETE® – Sustainable and Easily Transportable

TECHNO-CRETE® – Sustainable and Easily Transportable

Complete Composite Systems used their eco-friendly post mix, TECHNO-CRETE® during a recent installation for Siemens.

How ARCOsystem Is Boosting Digital Rail Communications

How ARCOsystem Is Boosting Digital Rail Communications

Complete Composite Systems' ARCOsystem leads the way in improving Wi-Fi coverage on rail networks across Europe.

Hamburg Installation Showcases Versatility of ARCOsystem

Hamburg Installation Showcases Versatility of ARCOsystem

A recent rail project in Hamburg, Germany highlighted the capability and flexibility of ARCOsystem to handle demanding installations.

Introducing… TouchSAFE Composite Palisade Fencing

Introducing… TouchSAFE Composite Palisade Fencing

TouchSAFE FRP Composite Fencing provides a robust, long-lasting and non-conductive barrier for the safe containment of electrical equipment.

Why ARCOSYSTEM® Is the Benchmark Cable Management System

Why ARCOSYSTEM® Is the Benchmark Cable Management System

ARCOSYSTEM® is a lightweight and versatile elevated cable management system with support structure and bracketry made from galvanised steel.

Case Study: Delivering Bespoke Elevated Cable Management

Case Study: Delivering Bespoke Elevated Cable Management

PACE Infrastructure Solutions were contracted to provide a bespoke elevated cable management system for a London Bridge Thameslink project.

Efficient and Easy Elevated Troughing with ARCOsystem

Efficient and Easy Elevated Troughing with ARCOsystem

Discover why ARCOsystem cable management was the ideal choice for a challenging railway elevated troughing installation project.

Advanced ARCOsystem Installation Method, Saving Time and Money

Advanced ARCOsystem Installation Method, Saving Time and Money

A new installation technique has made ARCOsystem, CCS' leading elevated cable management product, quicker and more cost-effective to deliver.

Contact Complete Composite Systems (CCS)

Use the form opposite to get in touch with Complete Composite Systems (CCS) directly to discuss any requirements you might have.








    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter