Trackside Cable Troughing Made Easy Thanks to ARCOSYSTEM®

Trackside Cable Troughing Made Easy Thanks to ARCOSYSTEM®
Address: 503 Broadway
Letchworth
Hertfordshire
SG6 3PT
UK
Phone: +44 (0)1462 379000 Connect: Website: View website Contact: Contact supplier View: View supplier Download: Download

Complete Composite Systems (CCS)

Trackside Cable Troughing Is Made Easy Thanks to the Flexible ARCOSYSTEM®

This article first appeared in the Railway-News magazine, Issue 3 2022.

Installing cable troughing alongside a railway line is often made more challenging due to an obstacle-laden route or inconvenient trackside access. However, with ARCOSYSTEM® — Complete Composite Systems’s versatile elevated cable management product — any installation job runs much smoother.

Manufactured from pultruded fibre-reinforced polymers (FRP), the lightweight composite troughing allows for height and directional adjustments to be made with ease when running it along complex routes.

Designed to be adaptable so it can be successfully installed in a variety of challenging settings and circumstances, ARCOSYSTEM® can be post-mounted, wall-hung or attached to an assortment of lineside structures such as bridges or even roadside barriers.

Secured by bespoke laser-cut steel bracketry, ARCOSYSTEM® can also span six metres between supports, allowing for swift and cost-effective installation compared to ground-based alternatives.

Navigating Bridges? No Problem!

ARCOSYSTEM® was recently chosen to be the cable management system for a batch of tricky jobs running across a number of bridges around the city of Darmstadt, near Frankfurt in Germany.

The cluster of projects presented several practical installation issues to solve, including having to mount the cable troughing atop a long run of ballast boards and designing a ‘river jump’ of more than ten metres. As can be seen in the images, the adjustable ARCOSYSTEM® proved it can be successfully attached to different styles of bridges in a diverse range of locations.

Another project required cable troughing to be fitted across a towering viaduct in the German ski resort of Willingen-Upland. With no room to lay down concrete and a limited working area for operatives along the bridge, our specialist narrower elevated version of ARCOSYSTEM® was the ideal solution for a space-constricted job in a soaring setting.

Innovative Solution

In a further example, the dexterity of ARCOSYSTEM® was put to the test during a recent project in the German town of Gössnitz.

Download the full PDF here.

completecomposites.co.uk

Other Complete Composite Systems (CCS) Documents

Latest Complete Composite Systems (CCS) News

CCS Achieves ISO 9001 Certification

CCS Achieves ISO 9001 Certification

We are delighted to announce that Complete Composite Systems has been awarded ISO 9001 accreditation.

Composite Ballast Boards Solve Problem at Earley Station

Composite Ballast Boards Solve Problem at Earley Station

CCS' innovative composite ballast boards were put to good use to protect rail passengers from a power supply cabinet in Berkshire, England.

Saving Time and Money With TECHNO-CRETE®

Saving Time and Money With TECHNO-CRETE®

CCS's TECHNO-CRETE® was once again proven to be a more cost-effective solution than concrete post mix during a trackside project in Wales.

CCS Publishes EPDs of Its Products

CCS Publishes EPDs of Its Products

Complete Composite Systems is proud to announce that it has published EPDs for two of its products, with more on the way.

New Project Highlights ARCO’s Versatile Installation Options

New Project Highlights ARCO’s Versatile Installation Options

There's a wide range of installation options available for fitting the ARCOSYSTEM® cable containment system beside railway tracks.

ARCOSYSTEM®’s Major Role in Transpennine Route Upgrade

ARCOSYSTEM®’s Major Role in Transpennine Route Upgrade

CCS' ARCOSYSTEM® cable troughing is proving to be a reliable and cost-effective choice for the major Transpennine Route Upgrade (TRU).

Why Composite Bridges Are the Future

Why Composite Bridges Are the Future

In association with BGL Ingenieurbau GmbH, CCS manufactures composite bridges from sustainable glass-fibre reinforced polyester (GRP).

Introducing Composite Ballast Boards

Introducing Composite Ballast Boards

The new CCS Composite Ballast Boards protect railway lines and trackside facilities from hazards such as rockfalls or snowslides.

ARCO’s Proficiency on Full Show

ARCO’s Proficiency on Full Show

Complete Composite Systems' ARCOSYSTEM® cable troughing was on full display during two recent trackside installations in Germany.

Check Out Our Eco-Friendly Products at Rail Live!

Check Out Our Eco-Friendly Products at Rail Live!

Rail Live offers the perfect opportunity to see CCS' innovative range of sustainable products for rail construction projects.

Why TECHNO-CRETE® Is the Practical Choice of Foundation Material

Why TECHNO-CRETE® Is the Practical Choice of Foundation Material

TECHNO-CRETE® is proving to be a successful and increasingly popular alternative to concrete post mix for rail construction projects.

ARCOSYSTEM® Is the Solution for EVCP Installation

ARCOSYSTEM® Is the Solution for EVCP Installation

CCS' cable containment system, ARCOSYSTEM®, proved to be an ideal choice for the challenging installation of EV charging points in Letchworth.

Fixing the Sleek Version of Arco with Ease

Fixing the Sleek Version of Arco with Ease

SizeZero®, the narrowest size of ARCOSYSTEM® troughing available, was fitted along a 4km stretch of track between Lubeck and Ahrensburg.

Collaboration with Anchor Systems Announced

Collaboration with Anchor Systems Announced

CCS has announced a collaboration with Anchor Systems International Ltd, making installation of the ARCOSYSTEM® cable troughing even faster.

How ARCO Can Be Attached to Rock Walls

How ARCO Can Be Attached to Rock Walls

CCS's innovative cable troughing ARCOSYSTEM® was recently fixed to a trackside rock wall during a challenging installation.

Installing ARCOSYSTEM® on Noise Barriers

Installing ARCOSYSTEM® on Noise Barriers

Recent installations show how CCS's elevated cable troughing, ARCOSYSTEM® can be securely attached to trackside noise barriers.

ARCOSYSTEM® the Perfect Fit In Scenic Austria

ARCOSYSTEM® the Perfect Fit In Scenic Austria

ARCOSYSTEM® elevated cable troughing was expertly installed at some challenging trackside locations in Austria.

No Earth Bonding Ensures TouchSAFE Fencing Saves Time and Money

No Earth Bonding Ensures TouchSAFE Fencing Saves Time and Money

Find out why TouchSAFE composite palisade fencing from Complete Composite Systems can save manufacturers time and money.

Discover More about ARCOSYSTEM® at InnoTrans!

Discover More about ARCOSYSTEM® at InnoTrans!

Complete Composite Systems will be on hand at InnoTrans 2022 to exhibit their cable troughing system, ARCOSYSTEM®.

A Picturesque Triumph for ARCO SizeZERO®

A Picturesque Triumph for ARCO SizeZERO®

ARCO SizeZERO®, the specialist narrower version of ARCOSYSTEM® was the ideal solution for the ski resort of Willingen-Upland, Germany.

See CCS’ Ground-Breaking Products at Rail Live 2022

See CCS’ Ground-Breaking Products at Rail Live 2022

A range of Complete Composite Systems' innovative composite and engineered plastic products will be showcased at the Rail Live 2022.

Navigating Bridges Is No Problem for ARCOSYSTEM®

Navigating Bridges Is No Problem for ARCOSYSTEM®

CCS's cable management product ARCOSYSTEM®, proved it can be successfully attached to a range of bridges in a group of recent installations.

Testing Project Displays ARCOSYSTEM®’s Adaptability

Testing Project Displays ARCOSYSTEM®’s Adaptability

ARCOSYSTEM® is designed to be adaptable so it can be installed in a variety of challenging settings, as proven in this recent installation.

TECHNO-CRETE® Plays Pivotal Role on TFL Project

TECHNO-CRETE® Plays Pivotal Role on TFL Project

TECHNO-CRETE® has made a significant contribution to a low-carbon, sustainable energy project on the London Docklands Light Railway network.

Flexibility of ARCOSYSTEM® on Full Show

Flexibility of ARCOSYSTEM® on Full Show

The flexibility of CCS's elevated cable management product ARCOSYSTEM® was clear during a recent installation in Germany.

TECHNO-CRETE®’s Huge Advantage over Concrete

TECHNO-CRETE®’s Huge Advantage over Concrete

Complete Composite Systems' eco-friendly post-mix TECHNO-CRETE® can be used on site during freezing temperatures.

Complete Composite Systems: Successful Installation in Flood-Hit Area

Complete Composite Systems: Successful Installation in Flood-Hit ...

Complete Composite System's versatile cable management product ARCOSYSTEM®, was successfully fitted in Kordel, Germany.

Complete Composite Systems: ARCOSYSTEM® Works Downhill

Complete Composite Systems: ARCOSYSTEM® Works Downhill

ARCOSYSTEM®️ from Complete Composite Systems was used in the challenging hillside project in the town of Neuhausen am Rheinfall.

TECHNO-CRETE® – Sustainable and Easily Transportable

TECHNO-CRETE® – Sustainable and Easily Transportable

Complete Composite Systems used their eco-friendly post mix, TECHNO-CRETE® during a recent installation for Siemens.

How ARCOsystem Is Boosting Digital Rail Communications

How ARCOsystem Is Boosting Digital Rail Communications

Complete Composite Systems' ARCOsystem leads the way in improving Wi-Fi coverage on rail networks across Europe.

Hamburg Installation Showcases Versatility of ARCOsystem

Hamburg Installation Showcases Versatility of ARCOsystem

A recent rail project in Hamburg, Germany highlighted the capability and flexibility of ARCOsystem to handle demanding installations.

Introducing… TouchSAFE Composite Palisade Fencing

Introducing… TouchSAFE Composite Palisade Fencing

TouchSAFE FRP Composite Fencing provides a robust, long-lasting and non-conductive barrier for the safe containment of electrical equipment.

Why ARCOSYSTEM® Is the Benchmark Cable Management System

Why ARCOSYSTEM® Is the Benchmark Cable Management System

ARCOSYSTEM® is a lightweight and versatile elevated cable management system with support structure and bracketry made from galvanised steel.

Case Study: Delivering Bespoke Elevated Cable Management

Case Study: Delivering Bespoke Elevated Cable Management

PACE Infrastructure Solutions were contracted to provide a bespoke elevated cable management system for a London Bridge Thameslink project.

Efficient and Easy Elevated Troughing with ARCOsystem

Efficient and Easy Elevated Troughing with ARCOsystem

Discover why ARCOsystem cable management was the ideal choice for a challenging railway elevated troughing installation project.

Advanced ARCOsystem Installation Method, Saving Time and Money

Advanced ARCOsystem Installation Method, Saving Time and Money

A new installation technique has made ARCOsystem, CCS' leading elevated cable management product, quicker and more cost-effective to deliver.

Contact Complete Composite Systems (CCS)

Use the form opposite to get in touch with Complete Composite Systems (CCS) directly to discuss any requirements you might have.








    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter