Emeg Group – Where Safety Always Comes First

Emeg Group – Where Safety Always Comes First
Address: Emeg UK:
Emeg Group Ltd
3 Dunston Place
Dunston Road
Whittington Moor
Chesterfield
S41 8NL

Emeg International:
Emeg Rail Systems LLC
Floor 41
Emirates Towers
Sheikh Zayed Road
Dubai
UAE
PO BOX 788
Phone: +44 (0)1246 268 678 Connect: Website: View website Contact: Contact supplier View: View supplier Download: Download

Emeg® Group

Emeg Group – Where Safety Always Comes First

This article first appeared in the Railway-News magazine Issue 4 2021.

Emeg is a company that prides itself on having experienced zero accidents in its entire 25-year trading history.

Its unrivalled safety record is largely due to Emeg Group’s Nil-Accident Culture HSE platform (Have you got the NAC?), but a passion for service, quality and safety runs far deeper than that. In fact, safety has been embedded in Emeg’s DNA since the company was founded back in 1997.

Managing Director, Richard Simmonite, said:

“We believe the strength of our company lies in the skills and expertise of its people, working in a diverse portfolio of engineering- based industries. Safety is viewed as a core, top-down business value and we are committed to ensuring the safety, health, wellbeing and welfare of everyone working for or on behalf of the Emeg Group, both here in the UK and overseas.”

Operations Director, Carl Backhouse, added:

“Our NAC platform isn’t just something that looks good on tenders, it’s something that defines our business-as-usual activities across the entire group. Our safety vision has evolved into a charter that our employees and suppliers must commit to if they want to do business with us.”

As well as providing a wide range of depot products (including carriage wash machines, fuelling, fume extraction, controlled emission toilets, ventilation, shore supplies, etc.) plus design and maintenance services, Emeg Group is a leading supplier of depot protection systems (DPS) with its next-generation, intelligent DPS, safeNet™️.

Emeg Group’s Safety Commitment

  • Safe behaviour is a requirement of working for Emeg Group
  • We will ensure our people have the correct tools and equipment to carry out the work
  • We will ensure our people have the skills and competency to carry out the work safely
  • We will plan our work to ensure it can be done safely
  • We will always take five minutes to identify any risks within the immediate work area and make sure they are controlled before starting
  • We will stop work if it cannot be done safely
  • We will always comply with the site and lifesaving rules
  • We will use close calls to report unsafe behaviour and conditions
  • We will not tolerate retribution or anyone reporting wrongdoing or suspected wrongdoing
  • We will keep our working environment tidy and when the work is completed, ensure the site is left in a safe condition

Download the full PDF here.

emeg.co.uk

Other Emeg® Group Documents

Latest Emeg® Group News

Silver Sponsor of Middle East Rail Expo in Dubai

Silver Sponsor of Middle East Rail Expo in Dubai

Emeg Group announce that they will be sponsoring the Middle East Rail Expo in Dubai on 12th & 13th October 2021 as a Silver Sponsor.

Howdon Satellite Depot Case Study

Howdon Satellite Depot Case Study

The Howdon Depot needed to be running as an additional depot facility. Emeg were responsible for project's detailed design and installation.

Introducing e-scan™ – Smart Laser Scanning

Introducing e-scan™ – Smart Laser Scanning

Emeg announce the launch of e-scan™, their laser scanning equipment generates a point cloud model from data captured in real life locations.

New £3m Beckton DLR Depot Contract Win

New £3m Beckton DLR Depot Contract Win

Emeg has secured a major package of work as part of the £100m Beckton DLR depot extension project, due to be completed by March 2022.

Plymouth Laira Depot Case Study

Plymouth Laira Depot Case Study

The Plymouth Laira depot is operated by Great Western Railway (GWR). Emeg guided GWR through the first principles of train servicing design.

Allerton Depot Case Study

Allerton Depot Case Study

The Allerton depot is one of four Network Rail depots to be upgraded to have OLE reinstated, facilitating electric rolling stock maintenance.

Contact Emeg® Group

Use the form opposite to get in touch with Emeg® Group directly to discuss any requirements you might have.






    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter