Case Study: Rapid Response

SRS Rail System International Ltd

Back
Case Study: Rapid Response
Contact: Contact supplier View: View supplier Download: Download

SRS Rail System International Ltd

At about 3:30am on Saturday 1st March 2008, the SRS Systems Ltd duty manager at Bolsover received a call from the Network Rail Rapid Response Team. The West Coast Main Line had been blocked in the Tring area by three 20 foot containers which freak gusts of wind had blown from their wagons. At 7am, just 3½ hours later, the SRS articulated road rail vehicle carrying a Palfinger PR750 crane arrived on site.

Other SRS Rail System International Ltd Documents

Latest SRS Rail System International Ltd News

SRS Rail: Making the Switch to HVO Fuel

SRS Rail: Making the Switch to HVO Fuel

HVO fuel is sustainable, cleaner and fully biodegradable with no additional infrastructure costs resulting in greener SRS RRV operations.

Contact SRS Rail System International Ltd

Use the form opposite to get in touch with SRS Rail System International Ltd directly to discuss any requirements you might have.









    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter