Case Study: Overhead Line Renewal

SRS Rail System International Ltd

Back
Case Study: Overhead Line Renewal
Contact: Contact supplier View: View supplier Download: Download

SRS Rail System International Ltd

Renewal of overhead line infrastructure on 650km of the west coast main line. 53 SRS road rail trucks were purchased for this task. Their performance is best described by the Joint Venture Project Director, John Osborne. As this major project neared its end in 2005, he wrote, “Road rail vehicles converted from standard trucks provided a versatile and effective means of servicing a work site 400 miles long…”

Other SRS Rail System International Ltd Documents

Latest SRS Rail System International Ltd News

SRS Rail: Making the Switch to HVO Fuel

SRS Rail: Making the Switch to HVO Fuel

HVO fuel is sustainable, cleaner and fully biodegradable with no additional infrastructure costs resulting in greener SRS RRV operations.

Contact SRS Rail System International Ltd

Use the form opposite to get in touch with SRS Rail System International Ltd directly to discuss any requirements you might have.









    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter