Balfour Beatty’s share of this £200 million project to complete a twin track electrified link between Edinburgh and Glasgow included the construction of new double track between Bathgate and Drumgelloch stations and doubling the single line from Drumgelloch and Airdrie. Most of the steelwork for the overhead line equipment was moved to site and lifted into position using two SRS road rail lorries.