Blend MX08 Concrete Agitator mixer was designed for the realization of the Monte Ceneri Base Tunnel: once finished (in 2020), this tunnel will reduce the travel time from Milan to Zurigo by about 1 hour and 15 minutes.
This is an important project for all Europe: delays are not allowed! Best executive quality is required! Monte Ceneri tunnel needs to have 2 tunnels of 15,4 Km/ each: n. 6 Blend MX08 will be there to cast concrete!
The first test was performed on 28th April 2017: Blend MX08 will start work inside the tunnel from July 2017
Use the form opposite to get in touch with Blend Plants directly to discuss any requirements you might have.