Blend MX08 Concrete Agitator

Blend MX08 Concrete Agitator
Contact: Contact supplier View: View supplier Download: Download

Blend Plants

Blend MX08 Concrete Agitator

Designed for: Ceneri Base Tunnel in Switzerland

Blend MX08 Concrete Agitator mixer was designed for the realization of the Monte Ceneri Base Tunnel: once finished (in 2020), this tunnel will reduce the travel time from Milan to Zurigo by about 1 hour and 15 minutes.

This is an important project for all Europe: delays are not allowed! Best executive quality is required! Monte Ceneri tunnel needs to have 2 tunnels of 15,4 Km/ each: n. 6 Blend MX08 will be there to cast concrete!

The first test was performed on 28th April 2017: Blend MX08 will start work inside the tunnel from July 2017

MX08 Characteristics

  • Hopper in Hardox to hold 8m3 of concrete
  • Auger with a diameter of 1.150 mm to mix the concrete: in this way we avoid segregation during transport
  • 120 kW motor + hydraulic system to mix and discharge concrete
  • Discharge with 3 augers together with 3 chutes
  • Hydraulic piston on each auger to control the cast
  • Shutter on each auger to control the instant flow of concrete to cast
  • Augers are not on tracks, in this way there is no deposit of concrete in the hopper
  • Automatic greasing system
  • Pre-wash system at high pressure
  • 2 water tanks of 500 Lt each
  • A big diesel tank
  • 3 lateral doors for inspection/ maintenance

www.blendplants.com

Other Blend Plants Documents

Latest Blend Plants News

Blend Plants: Concrete Express

Blend Plants: Concrete Express

Concrete Express: Blend Plants is ideal for the rail works sector – delivering multi-functionality, compactness and guaranteed results.

CBT: Switzerland’s Third Largest Railway Tunnel Project

CBT: Switzerland’s Third Largest Railway Tunnel Project

The Ceneri Base Tunnel, the third largest railway tunnel project in Switzerland, is scheduled to become operational at the end of 2020.

Ceneri Base Tunnel: The First Tracks

Ceneri Base Tunnel: The First Tracks

The Ceneri Base Tunnel, the second longest tunnel project in Switzerland, will complete the NRLA project (New Railway Link through the Alps).

Rail Mounted Concrete Mixing Plant for London Underground

Rail Mounted Concrete Mixing Plant for London Underground

In 2013 Blend Plants took part in an important project to create a mobile mixing plant for London Underground requirements.

New London Underground Slab Track Cast In-Situ

New London Underground Slab Track Cast In-Situ

B2F is the London Underground project to renew the track in tunnels between Baker Street and Finchley Road on the Metropolitan line.

Contact Blend Plants

Use the form opposite to get in touch with Blend Plants directly to discuss any requirements you might have.







    We'd love to send you the latest news and information from the world of Railway-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Railway-News to store and process this information.

    Subscribe
    Follow Railway-News on LinkedIn
    Follow Railway-News on Twitter